How long does a rebar processing line take to install?
The schedule depends on the foundation, power supply and crane access being ready before the machines arrive. The sequence is: set and level the machines, connect power and hydraulics, commission each unit, then run a test batch with your bar sizes. We provide the foundation drawing and utility list with the order and confirm the commissioning plan before shipment; the site days are agreed against your readiness, not quoted as a fixed number.